Last week the contractors (WSP), installed the majority of the equipment for the lake trial. The aeration manifold (marked by two orange buoys in the trial area of the lake - see below), the air compressor enclosure and the turbidity curtains (see below). The compressor will be installed in a few weeks.
To avoid damage to the turbidity curtains can lake users please avoid crossing over the curtains. These are located under the two footbridges (see images below).
New monitoring buoy next to aeration manifold
Aeration manifold
Curtains at Bob's Bridge
Curtains at small bridge
Comments